The honest answer to “how long does it take to build a website” depends on how big the site is and how quickly the pieces come together. For our own projects, a small business site takes about 4 weeks, a larger one about 6 weeks and an online store 8 to 10 weeks. Below is what sits behind those numbers, and what you can do to keep your launch date.
How long does it take to build a website, package by package
These are our own timelines for each package. Your quote includes the launch date, so you know exactly when to expect it before any work starts.
- Launch, about 4 weeks. Up to 6 pages, with custom design, copywriting for every page, technical SEO, analytics and forms. It suits a business that needs to look established, fast.
- Growth, about 6 weeks. Up to 15 pages, adding conversion-focused copy, local SEO pages, a blog and a CRM, booking or email integration.
- Store, 8 to 10 weeks. One of our online stores on WooCommerce or Shopify, with up to 500 products imported and payments, shipping and taxes set up.
- Brand identity, 2 to 3 weeks. A logo, palette, typography and a one-page brand guide.
- Custom development. Configurators, client portals, booking flows and integrations are scoped together, so the timeline is agreed in the quote for that specific project.
The gap between packages is mostly scope. More pages mean more writing, more design and more to review. A store adds products, payments, shipping, taxes and a checkout that has to be tested properly, which is why it takes longer than a site that collects enquiries.
What happens before the build starts
Before any design work, a short planning stage sets the schedule. It begins with a free 20-minute diagnostic, where we review your current site, or talk through what you need if you don’t have one yet. Then you get a fixed quote, with the scope, timeline and price agreed in writing within 3 business days.
That quote includes your launch date, and if we miss it, your next month of care is free. Having the date in writing also helps you plan the rest of your business around it, whether that means a product launch, a busy season or an ad campaign.
Where the weeks go
Whatever the size of the project, the work follows the same rhythm.
- Getting to know your business. Copywriting is always included, and it is written by people who interview you, so an early job is a conversation about your customers, your services and how people search for them.
- Design. You review the design and approve it. The second payment, 40%, falls at that approval, so it works as a clear milestone in the schedule.
- Build. You follow progress on a live preview link, with weekly check-ins so you always know where things stand.
- Review and launch. You approve every page before launch. Then we launch, monitor the site and keep improving it. Launch sites come with 30 days of support after launch, and Growth and Store projects with 60 days.
What makes a project faster
A lot of project time is spent waiting: for a photo, a login or a decision. These habits keep a build moving.
- Your materials are gathered early. You don’t have to write anything, but collect what only you have: logo files, photos of your team, your work or your products, licenses or certifications you want to show, and reviews you already have.
- Time set aside for the interview. The better we understand your business at the start, the fewer edits the copy needs later.
- One decision maker. Name one person who can approve pages and answer questions. If partners or managers need a say, gather their comments into a single reply.
- Prompt feedback. Weekly check-ins only work if answers come back quickly, so each week can build on the last.
- Access sorted out. Have the logins for your domain, current hosting, Google accounts and any tools the site connects to. Tracking down a lost password can take longer than building a page.
- A clear first version. Decide what has to be there on launch day and what can wait. A focused site that goes live on time can grow afterwards, since extra pages are a $350 add-on.
What makes a project slower
- Waiting on content only you can provide. Product photos, prices, service details and team bios. For a store, the product import is only as fast as the product data is clean. A spreadsheet with missing prices, sizes or photos takes time to fix.
- New voices late in the project. When someone joins the review near the end and asks to change pages that were already approved, work has to be redone.
- Scope that grows midway. Changes are only added if you ask for them, but each new page or feature is extra work, and extra work can move the date.
- Integrations. Connecting a CRM, a booking system, an email platform or a payment provider depends on accounts and access on the other side. For a store, payments, shipping and taxes all need to be set up and tested before launch.
- A second language. An additional language means more writing and more pages to check. Include it from the start, so it is part of the quote and the launch date.
- No brand yet. If you need a logo and identity first, brand identity work takes 2 to 3 weeks, and the website design builds on it.
- Moving from an old site. Replacing an existing site means deciding what content to keep, moving it and setting up redirects so old links still work.
If your deadline is tight
Sometimes the date matters more than anything else. Here are honest ways to handle that.
- Ask for rush delivery. It is available as an add-on at +25% of the build, and your quote shows the launch date it gets you.
- Start smaller. Launch with the pages that matter most now, then add the rest once the site is live.
- Fix what you have. If your current site is basically sound, a Refresh Sprint or a Speed rescue on the existing site can carry you past the deadline without a rebuild.
- Keep it simple for now. If you need something online within days, a basic page you set up yourself with a website builder may be the right call for the moment. It won’t do the job of a full site, but it can hold your place while a proper one is built.
Planning your project with us
If you have a date in mind, tell us early. The diagnostic is free and takes 20 minutes, the fixed quote follows within 3 business days, and the launch date goes in writing. You can compare what each package includes, and how long it takes, on our pricing page.
The easiest first step is a free 20-minute diagnostic. We review your current site before the call, or talk through what you need if you don’t have one yet, and you leave knowing what we would do first.